Pumps
(Click Each For Details)

Duce Construction Company also has a wide range of concrete pumps for use. Look below to see which pump will best suit your job requirements.

RATES AS OF January 1, 2016  

Austin Ducey Mobile (217) 841-2522
Kevin's Mobile (217) 202-5722
Michael's Mobile (217) 202-5727

28 METER BOOM PUMP
92' VERTICAL 72' OFF OF FRONT BUMPER

$155.00 PER HOUR 4 HOUR MINIMUM
$3.00 PER CUBIC YARD PUMPED
$2.00 PER MILE TRAVEL BOTH WAYS

Pump Specs
 

31 METER low clearance boom unfolds in 18'8”
100' VERTICAL 80' OFF OF FRONT BUMPER

$155.00 PER HOUR 4 HOUR MINIMUM
$3.00 PER CUBIC YARD PUMPED
$2.00 PER MILE TRAVEL BOTH WAYS
$70.00 Permit Fee (Illinois)

Pump Specs



36 METER BOOM PUMP
116’ VERTICAL 98’ OFF OF FRONT BUMPER

$160.00 PER HOUR 4 HOUR MINIMUM
$3.25 PER CUBIC YARD PUMPED
$2.00 PER MILE TRAVEL BOTH WAYS
Pump Specs

39 METER BOOM PUMP
127' VERTICAL 106’ OFF OF FRONT BUMPER

$167.00 PER HOUR 4 HOUR MINIMUM
$3.25 PER CUBIC YARD PUMPED
$2.00 PER MILE TRAVEL BOTH WAYS
$70.00 Permit Fee (Illinois)
Pump Specs

55 METER BOOM PUMP
180' VERTICAL 160' OFF OF FRONT BUMPER

$240.00 PER HOUR 5 HOUR MINIMUM
$4.00 PER CUBIC YARD PUMPED
$2.50 PER MILE TRAVEL BOTH WAYS
55m require oversize/overweight permit additional charge

105/110 TELEBELT

$167.00 PER HOUR 4 HOUR MINIMUM
$3.25 PER CUBIC YARD
$2.50 TON
$2.00 PER MILE TRAVEL BOTH WAYS
$70.00 Permit Fee (Illinois)
Belt Specs  

BPL 4000/750 LINE PUMP ANY HOSE SIZE

$140.00 PER HOUR 5 HOUR MINIMUM
$3.00 PER CUBIC YARD PUMPED
$2.00 PER MILE TRAVEL BOTH WAYS

750 LINE PUMP FOR SHOT CRETE OR GROUTING

$140.00 PER HOUR 5 HOUR MINIMUM
$3.00 PER CUBIC YARD PUMPED
$2.00 PER MILE TRAVEL BOTH WAYS

Overtime rates for the pump operator will be assessed for any hours before 7:00 AM over eight hours including travel or after 3:30 PM daily. Saturday pours are billed at overtime rates. The operator overtime rate is $35.00 per hour. Sunday and holidays are double time $65.00 per hour.

- $85.00 per hour both ways for any pre pour, safety meetings, or pipe line delivery/assistance for set up.

- Prime will be $15.00 per bag excluding pipe line pours. Pipe line pours will require 1 cubic yard of grout prior to concrete to be provided by the contractor.

- The contractor is required to provide a safe area for the pump to set up and wash out. All towing will be at the contractor’s expense.

- Customers are advised that concrete pumps are subject to occasional mechanical failure and if assured performance is required standby pumps are available at the above quoted rates.

- Cancellation Policy: The contractor must call two (2) hours prior to scheduled concrete. If failure to do so the minimum will be billed.

- Terms net 30 days with approved credit. No Retainage.

- Customers are advised that pending fuel prices a fuel charge may be assessed.

THANK YOU FOR YOUR BUSINESS

Michael F. Ducey, President

Duce Construction Company

You may contact: Austin Ducey (Dispatcher) (217) 841-2522.

28 Meter
28 Meter

31 Meter

31 Meter

39 Meter

Trailer Pump

City Pump